The Ivorian economy recorded strong momentum, with average real GDP growth of 5,5% over the 2019-2023 period, driven by substantial public and private investment. In nominal terms, these investments rose from 7 845,9 billion CFA francs (FCFA) in 2019 to 11 175,9 billion FCFA in 2023.
The country's current development policy is set out in the National Development Plan (PND) 2021-2025, valued at 59 000 billion FCFA. The expected contribution of the private sector amounts to 43 646,7 billion FCFA, or 74% of the total. Several major projects are planned for implementation with the participation of the private sector. For more information :www.gcpnd.gouv.ci
Source: MEPD/DGE
Trend in FDI according to CEPICI data in Côte d’Ivoire in 2024
In 2024, foreign direct investment (FDI) recorded in Côte d’Ivoire declined slightly compared with the previous year. Total FDI volume fell from 436 billion FCFA in 2024, compared with 471 billion FCFA in 2023, a decrease of 7,4 %. This decline may be linked to a global economic slowdown as well as strategic adjustments by international investors.
Despite this overall decline, some sectors continued to attract foreign capital, while others recorded a marked fall. The agri-food/agro-industry sector accounted for (38,91%) of investment, followed by telecommunications (20,73%) and other manufacturing industries (10,63%).
The leading investor countries were Mauritius (30,47%), France (12,99%), Singapore (11,20%) and China (5%).
Approved Investments, 2012-2024
Investment approval | ||||||||||||||
| Categories | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | TOTAL |
| Investment volume (in billions of FCFA) | 219 | 514 | 426 | 670 | 672 | 466 | 703 | 730 | 632 | 642 | 714 | 471 | 436 | 7295 |
| FDI (in billions of FCFA) | 119 | 380 | 261 | 423 | 491 | 373 | 544 | 553 | 338 | 357 | 496 | 471 | 436 | 5242 |
| IDN (in billions of FCFA) | 100 | 134 | 165 | 247 | 181 | 93 | 159 | 177 | 294 | 285 | 218 | 0 | 0 | 2053 |
Source : CEPICI
Source : CEPICI
- Breakdown of FDI by sector of activity
The table below shows the main sectors of activity that attracted the most FDI. These are: (i) agri-food/agro-industry, 169 billion FCFA (38,91%); (ii) telecommunications, 90,35 billion FCFA (20,73%); (iii) other manufacturing industries, 46,33 billion FCFA (10,63%); and (iv) the chemical industry (cosmetics, pharmaceuticals and rubber), 44,95 billion FCFA (10,32%).
However, investment trends were more mixed in sectors such as other services, 4,73 billion FCFA (1,09%); petroleum products, 1,51 billion FCFA (0,36%); education/training/health, 701 million FCFA (0,16%); and food-crop farming and livestock, 428 million FCFA (0,10%).
Breakdown of FDI by sector of activity (in billions of FCFA), 2024
| Sector of activity | FDI amount | Percentage |
| AGRI-FOOD / AGRO-INDUSTRY | 169 604 529 451 | 38,91 |
| TELECOMMUNICATIONS | 90 351 987 822 | 20,73 |
| OTHER MANUFACTURING INDUSTRIES | 46 335 975 704 | 10,63 |
| CHEMICAL INDUSTRY (COSMETICS - PHARMACEUTICALS - RUBBER | 44 956 660 363 | 10,32 |
| ENERGY (GAS - WATER) | 21 338 217 347 | 4,90 |
| HOTELS (FOOD SERVICE - ACCOMMODATION) | 17 459 533 289 | 4,01 |
| TRANSPORT / STORAGE (HANDLING) | 13 052 561 549 | 2,99 |
| FOOD-CROP FARMING, LIVESTOCK | 11 306 398 772 | 2,59 |
| CONSTRUCTION | 7 234 494 444 | 1,66 |
| EXTRACTIVE INDUSTRY | 6 818 618 939 | 1,56 |
| OTHER SERVICES | 4 731 773 954 | 1,09 |
| PETROLEUM PRODUCTS | 1 516 388 226 | 0,35 |
| EDUCATION / TRAINING / HEALTH | 701 103 381 | 0,16 |
| EXPORT AGRICULTURE | 428 032 641 | 0,10 |
| Total | 435 836 275 882 | 100 |
Source : CEPICI
Change in FDI by sector of activity (in billions of FCFA), 2023 to 2024
Origin of FDI by country of origin
Sector of activity Investment amount
in FCFA in 2023
Investment amount in FCFA in 2024 Change in % AGRI-FOOD / AGRO-INDUSTRY 150 652 351 671
169 604 529 451
12,58
TELECOMMUNICATIONS 43 982 505 664
90 351 987 822
105,43
OTHER MANUFACTURING INDUSTRIES 50 103 828 928
46 335 975 704
-7,52
CHEMICAL INDUSTRY (COSMETICS - PHARMACEUTICALS - RUBBER 58 910 493 412
44 956 660 363
-23,69
ENERGY (GAS - WATER) 16 047 696 298
21 338 217 347
32,97
HOTELS (FOOD SERVICE - ACCOMMODATION) 4 744 631 242
17 459 533 289
267,99
TRANSPORT / STORAGE (HANDLING) 76 357 219 815
13 052 561 549
-82,91
FOOD-CROP FARMING, LIVESTOCK -411 307 602
11 306 398 772
2848,89
CONSTRUCTION INDUSTRY 38 731 553 368
7 234 494 444
-81,32
EXTRACTIVE INDUSTRY 11 437 505 549
6 818 618 939
-40,38
OTHER SERVICES 19 327 735 417
4 731 773 954
-75,52
PETROLEUM PRODUCTS -
1 516 388 226
-
EDUCATION / TRAINING / HEALTH 1 027 162 026
701 103 381
-31,74
EXPORT AGRICULTURE -
428 032 641
-
Total 470 911 375 788
435 836 275 882
In 2024, according to CEPICI data, FDI amounted to 435,83 billion FCFA. The table below shows that Mauritius ranked first, with 132,83 billion FCFA, followed by France in second place with 53,16 billion FCFA; Singapore ranked third with 52,77 billion FCFA.
In Africa, Morocco ranked first with 32,28 billion FCFA, followed by Mali with 22,83 billion FCFA, Burkina Faso with 4,82 billion FCFA and Senegal with 4,63 billion FCFA. They were followed by Tunisia with 3,90 billion FCFA, Guinea with 988 million FCFA, Niger with 920 million FCFA, Mauritania with 853 million FCFA, Togo with 590 million FCFA, Ghana with 27 million FCFA and, finally, Cameroon with 9,55 million FCFA.
Main foreign investor countries
| RANK | ORIGIN | INVESTMENT AMOUNT (in billions of FCFA) |
| 1 | MAURITIUS | 132 834 628 030 |
| 2 | FRANCE | 53 166 666 697 |
| 3 | SINGAPORE | 52 774 523 207 |
| 4 | UNITED KINGDOM | 32 884 466 558 |
| 5 | MOROCCO | 32 282 603 809 |
| 6 | INDIA | 27 450 497 821 |
| 7 | MALI | 22 837 863 609 |
| 8 | SWITZERLAND | 10 815 995 174 |
| 9 | CHINA | 10 310 823 667 |
| 10 | LEBANON | 9 547 576 508 |
| 11 | CYPRUS | 9 354 280 923 |
| 12 | HONG KONG | 7 174 769 187 |
| 13 | CANADA | 5 549 260 236 |
| 14 | BURKINA FASO | 4 824 028 876 |
| 15 | SENEGAL | 4 636 833 526 |
| 16 | NETHERLANDS | 4 207 739 497 |
| 17 | TUNISIA | 3 904 752 921 |
| 18 | UNITED ARAB EMIRATES | 2 256 099 205 |
| 19 | RUSSIA | 1 819 125 000 |
| 20 | GERMANY | 1 301 338 439 |
| 21 | USA | 1 246 787 707 |
| 22 | GUINEA | 988 487 138 |
| 23 | NIGER | 920 212 500 |
| 24 | MAURITANIA | 853 133 125 |
| 25 | TOGO | 590 344 968 |
| 26 | ITALY | 484 316 817 |
| 27 | BELGIUM | 378 370 551 |
| 28 | TURKEY | 203 222 375 |
| 29 | MALAYSIA | 133 545 380 |
| 30 | EGYPT | 67 500 000 |
| 31 | GHANA | 27 040 250 |
| 32 | CAMEROON | 9 559 495 |
| 33 | MONACO | -11 731 |
| 34 | CAYMAN ISLANDS | -105 582 |
| Grand total | 435 836 275 883 | |
Source : CEPICI
The top 10 foreign investor countries/strong>
Source : CEPICI
CEPICI's main results for businesses created and jobs projected in 2024
- Number of businesses created through FDI
Number of businesses created by CEPICI in 2024
| Categories | January-December 2024 |
| Number of businesses created | 25 477 |
Number of jobs projected by businesses created | 4 310 |
| Average time to set up a business | 4,3 |
Source : CEPICI
Number of businesses approved by CEPICI in 2024
| Categories | January-December 2024 |
| Number of businesses approved | 146 |
Number of jobs planned per approved business | 4 823 |
Source : CEPICI
GUFE in figures
| Item | 2023 | 2024 | Change |
| Number of applications submitted | NP | NP | NP |
| Number of companies created | 25 429 | 25 477 | 0,19% |
| Projected number of jobs | 5 207 | 4 823 | -7,37% |
| Average number of companies created per day | 101 |
|
|
| Average time to set up a company, in days | 5,2 days | 4,3 days |
|
Source : CEPICI
Sectoral and geographical concentration
Analysis of sectors favoured by investors
In 2024, Côte d’Ivoire continued to offer investors a diverse range of attractive sectors, each presenting significant opportunities in light of current economic trends and the priorities of the development plan (PND 2021-2025).
According to CEPICI data, several key sectors attract significant FDI flows. The sectors favoured by investors are as follows :
Agro-industry: 169 billion FCFA in investment, with strong potential in the production of cocoa, coffee, cashew nuts and palm oil. Investment in agricultural processing, agri-food and innovative agricultural technologies was particularly attractive ;
Information and communication technologies (ICT; TIC) : 90 billion FCFA in investment. This sector is expanding rapidly, with increased Internet access and growing adoption of digital technologies (including software development and digital start-ups) ;
Manufacturing industry : 46 billion FCFA in investment. The country is encouraging local processing of raw materials, particularly in agro-industry, textiles and chemicals ;
Chemical industry : 44 billion FCFA in investment. The Government has implemented measures and other reforms to improve the sector's productivity and competitiveness ;
Energy (gas and water) : 21 billion FCFA in investment. Côte d'Ivoire is seeking to diversify its energy mix by investing in renewable energy, particularly solar and hydropower (construction of solar power plants at Boundiali (37,5 MWc) and Sokhoro (52 MW)). In the gas sub-sector, investments are planned, including stepped-up promotion of blocks and exploration activities to discover new crude oil and natural gas reserves; development of the CI-27 field; and preparation for phase 4 drilling to develop the Espoir field in block CI-26 ;
Tourism (food service and accommodation) : 17 billion FCFA in investment. This sector has received increased attention, notably with the organisation of the 2023 Africa Cup of Nations. The State has also launched a major development project for the sector through the « Sublime CI » project, which highlights the country's assets to attract more investors ;
Transport and storage : 13 billion FCFA in investment. As an important pillar of the country's economy, the sector has many advantages that open up numerous investment opportunities.
Some regions with strong potential
The Sud-Comoé Region is part of the area covered by Agro-pole 3, the food-crop basin and agro-industrial zone near Abidjan. This region offers investment opportunities in several sectors :
Grand-Bassam Free Zone : Village of Information Technology and Biotechnology (VITIB) ;
Agriculture and agro-industry : establishment of processing plants for cash crops (cocoa, coffee, oil palm and rubber) and development of the fisheries value chain ;
Agro-industry : establishment of rubber and oil palm plantations, and processing of oil-palm shell waste and empty coconut shells into by-products ;
Mineral resources : The region has gold mining potential and exploration permits, particularly in the departments of Aboisso and Tiapoum.
Agneby-Tiassa is part of the area covered by Agro-pole 5, the food-crop basin and agro-industrial zone near Abidjan. Investment opportunities include :
Agriculture: investment in agricultural development, including lowland areas; development of food-crop value chains (rice, market gardening and cassava), cash-crop value chains (rubber, oil palm and cocoa), and livestock and fisheries value chains (fishing and poultry).
Agro-industry : processing of agricultural raw materials ;
Mining : manganese (Aboudé in the Sub-prefecture of Oress-Krobou) and gold (Taabo and Tiassalé) ;
Tourism : ecotourism through the rehabilitation and maintenance of parks and reserves.
The Grand-Lac Region, Yamoussoukro, is part of the area covered by Agro-pole 4, the « Academic and Processing Hub ». The opportunities available are as follows :
Agriculture and agro-industry : the launch of the Agro-Industrial Hub in the Bélier Region (2PAI-BELIER) supports the establishment of a foundation for processing and agricultural modernisation by restoring and developing productive capital, modernising land-preparation and communication tools (TIC), and promoting the private sector and industrialisation.
Urban sanitation: construction of a modern landfill with electricity generation ;
Tourism : rehabilitation of the Abokouamékro wildlife park ;
Health : construction of a paediatric hospital ;
Mineral resources : the region has gold mining potential ;
Transport : construction of a bus station.
The PORO Region is part of the area covered by Agro-pole 1, a processing and export hub for fruit and cashew nuts. Opportunities include :
Agriculture: investment in hydro-agricultural development, irrigation infrastructure, and production and storage support; development of food-crop value chains (maize, millet, sorghum, rice and onions), cash-crop value chains (cotton, cashew nuts and mangoes), and livestock value chains (cattle and sheep).
Education and training : establishment and operation of schools, middle schools, high schools, and higher education, technical and vocational institutions ;
Agro-industry : establishment of industries to process agricultural raw materials (cotton, cashew nuts, mangoes, etc.) ;
Tourism : investment in hotel complexes and the creation of tourist routes ;
Mineral resources : exploration and development of mineral resources (gold, manganese and tantalum).
The Gbêkê Region is part of the area covered by Agro-pole 4, the « Academic and Processing Hub ». The region offers opportunities in sectors such as :
Agriculture : establishment of agro-pastoral farms or financing of agricultural projects; investment in the development of food-crop value chains (yam, rice and cassava) and cash-crop value chains (cocoa, coffee and cashew nuts).
Agro-industry : investment in infrastructure for processing agricultural products (cashew nuts and cotton) ;
Construction and public works : construction of housing (mid-range, affordable and social housing) ;
National education : establishment of schools (construction and operation).
The Grands-Ponts Region is part of the area covered by Agro-pole 5, the food-crop basin and agro-industrial zone near Abidjan. It offers opportunities in :
Agriculture: investment in the development of food-crop value chains (market gardening and cassava), cash-crop value chains (rubber and oil palm), livestock and fisheries value chains (fishing and poultry), as well as soilless cultivation.
Tourism : construction of beachfront hotel facilities to develop tourism, and beach development ;
Fishing : projects to build jetties to revive maritime and fishing activities, establish a wholesale fish market in Jacqueville, and create shrimp and lobster production units ;
Oil and gas : project to convert natural gas into ammonia and nitrogen fertiliser ;
Construction and public works (BTP) : project to build a new town in Jacqueville over an area of 300 ha.
The geographical distribution of investment in Côte d'Ivoire reflects the country's commitment to promoting economic diversity and the specific opportunities offered by each region.
Project catalogue
| No. | SECTOR : AGRO-INDUSTRY |
| 1 | Industrial irrigated maize plantation covering 600 Ha |
| 2 | Industrial chilli pepper plantation covering 50 Ha |
| 3 | Industrial plantain plantation covering 100 Ha |
| 4 | Industrial pineapple production over 2000 Ha |
| 5 | Construction of a cashew nut processing plant with a capacity of 15 000 tonnes per year |
| 6 | Natural rubber plant processing latex with a capacity of 70 000 tonnes per year |
| 7 | Shea nut processing plant with a capacity of 1000 tonnes per year |
| 8 | Construction of a mango and vegetable drying plant (4 000 tonnes of vegetables and 3 000 tonnes of dried mangoes per year) – 2PAI-NORD (CI) |
| 9 | Construction of a peanut oil and paste plant producing 5 800 tonnes of products per year (1 500 tonnes of oil and 4 300 tonnes of peanut paste per year) – 2PAI-NORD (CI) |
| 10 | Construction of a plant producing cottonseed oil and animal feed (3 800 tonnes of oil and 10 700 tonnes of animal feed per year) – 2PAI-NORD (CI) |
| 11 | Construction of a meat production plant with a capacity of 13 300 tonnes per year – 2PAI-NORD (CI) |
| 12 | Construction of a mango and cashew apple juice plant (90 000 tonnes of fresh mangoes and 800 000 tonnes of cashew apples processed per year) - 2PAI-NORD (CI) |
| 13 | Construction of a plant producing oil from shea butter (1 000 tonnes per year) – 2PAI-NORD (CI) |
| 14 | Construction of a maize flour plant with a capacity of 90 000 tonnes per year – 2PAI-NORD (CI) |
| 15 | Construction of a packaging plant for fresh market-garden produce (54 000 tonnes of fresh vegetables per year) – 2PAI-NORD (CI) |
| 16 | Frozen plantain and yam chips production unit with a capacity of 10 000 tonnes per year |
| 17 | Fruit and vegetable processing unit producing jam, cosmetic products and spices, with a capacity of 18 000 tonnes per year |
| 18 | Construction of 15 independent cassava processing units, each with a capacity of 25 tonnes per day |
| 19 | Cassava processing unit with a capacity of 1,5 tonne per day |
| 20 | Cassava plantation combined with a cassava-to-starch processing plant with a capacity of 12 tonnes per hour |
| 21 | Okra processing unit with a capacity of 1 tonne per day |
| 22 | Value addition to products in the cocoa value chain by « Maison Mandjou ». |
| 23 | Establishment of a 6000 Ha rice-growing complex in central Côte d’Ivoire |
| 24 | Development of rice-growing complexes in the Agneby-Tiassa Region |
| 25 | Establishment of a unit to process raw cocoa beans into finished and semi-finished products (cocoa liquor, cocoa powder, cake and cocoa butter), with a capacity of 30 000 tonnes per year |
| 26 | Industrial maize plantation covering 100 Ha |
| 27 | Establishment of an integrated agro-industrial pineapple production and processing unit over 250 hectares |
| 28 | Establishment of an integrated agro-industrial rice production and processing unit |
| 29 | Establishment of a unit producing refined oil (olein), stearin and fatty acids (olein/cooking oil: 80 000 t / year, fatty acids: 5 000 t / year; stearin: 20 000 t / year) |
| 30 | Establishment of a unit producing oil, meal and shells from palm kernels (palm kernel oil / year: 4 000 t / year; meal: 5 000 t / year; palm kernel shells: 12 000 t / year) |
| 31 | Establishment of a cocoa bean processing unit producing cocoa mass, with a capacity of 3 000 tonnes per year (for cooperatives) |
| 32 | Establishment of a palm fruit processing unit producing red palm oil, with a capacity of 32 400 tonnes per year |
| 33 | Establishment of a TSR10-type rubber production plant with a capacity of 12 500 tonnes per year |
| 34 | Establishment of a natural rubber plant processing latex with a capacity of 33 000 tonnes per year |
| 35 | Establishment of modern food-crop storage and drying units |
| 36 | Establishment of three (03) cassava-to-starch flour processing units for the agri-food industry, each with a capacity of 3 000 tonnes per year |
| 37 | Establishment of a palm oil production unit with a capacity of 6 000 tonnes per year |
| 38 | Establishment of a modern agro-industrial processing unit for cereals, food crops, tubers and oilseeds, with a capacity of 10 000 tonnes per year |
| 39 | Project to take over a semi-industrial unit producing and marketing attiéké and by-products (4,5 tonnes of attiéké /month, 1 tonne of starch, 1 tonne of cassava peel for livestock feed) |
| 40 | Establishment of a small-scale organic fertiliser plant using cocoa residues, with a capacity of 1 500 tonnes per year |
| 41 | Establishment of an industrial coconut plantation and processing into by-products |
| 42 | Establishment of a local coffee processing unit (to be certified) |
| 43 | Establishment of an industrial plantation of premium local pepper (to be certified) |
| 44 | Establishment of an industrial food-crop and fruit plantation (papaya, passion fruit, mangosteen, etc.) |
| 45 | Project to take over the industrial dessert banana plantation (former CANAVESE) in Akressi |
| 46 | Establishment of a maize and cassava processing unit in Aboisso |
| 47 | Establishment of small-scale cashew processing units |
| 48 | Development and rehabilitation of irrigated food-crop areas in NAFOUN and DIKODOUGOU |
| 49 | Establishment of a two-hectare greenhouse market-gardening plantation in Maféré |
| 50 | Establishment of a four-hectare irrigated plantain plantation in Maféré |
| 51 | Industrial production of Maféré Bread |
| No. | SECTOR : LIVESTOCK |
| 1 | Establishment of a poultry farm with 1,2 million birds |
| 2 | Construction of a modern poultry slaughterhouse with a capacity of 50 000 birds per day |
| 3 | Development of an integrated cattle ranching project, including a vocational training centre and a fodder production unit (three ranches to fatten 3 000 animals over 1 500 ha) |
| 4 | Construction of a livestock feed plant using rice bran, mango peel and cashew apple peel (340 000 tonnes of livestock feed per year) – 2PAI-NORD (CI) |
| 5 | TAABO fisheries park covering 76 Ha |
| 6 | Fish farming in floating cages with a capacity of 20 000 m3 |
| 7 | Fish feed production plant with a capacity of 2000 tonnes per year |
| 8 | 10 modern fish-drying ovens with a capacity of 100 tonnes per day |
| 9 | Integrated poultry hub covering 16 Ha |
| 10 | Hatcheries for day-old chicks, with a capacity of 2 300 000 day-old chicks per year |
| 11 | Pig farm with a capacity of 236 000 Kg per year |
| 12 | Integrated pig production project |
| 13 | Organic pig feed production plant with a capacity of 800 tonnes per year |
| 14 | Construction of a poultry complex to produce poultry and by-products (protein meal) |
| 15 | Construction of a fisheries production and processing complex in Grand Bassam |
| 16 | Establishment of a poultry feed production unit with a capacity of 5 000 tonnes per year |
| 17 | Establishment and operation of a fish farm covering 25 hectares |
| 18 | Establishment and operation of a marine fishing unit producing 720 tonnes of fish per year |
| 19 | Establishment of a day-old chick production unit with a capacity of 12 000 000 chicks per year |
| 20 | Shrimp farming project with annual production of 1200 T |
| 21 | Aquaculture industry modernisation project on Lake Ayamé |
| 22 | Fish farming development project (Emeraude Pisciculture Sud Comoé farm): production of 10 tonnes of fresh tilapia per year |
| 23 | Installation of livestock feed (fodder) production units: 5 000 tonnes per year |
| 24 | Establishment of a fish farm in LOKOLI |
| 25 | Support for young people to take up beekeeping and honey production for export in the LOKOLI area |
| 26 | Construction of a modern abattoir in Maféré |
| No. | SECTORS : LOGISTICS / TRADE |
| 1 | Development of a logistics platform in the 1000-hectare industrial zone in Bouaké |
| 2 | Installation of a cold chain with a containerised central refrigeration system |
| 3 | Construction of the Bouaké wholesale market over 12,4 Ha |
| 4 | Construction of a space for 200 restaurants / refreshment stands |
| 5 | Establishment of cold-storage and ripening warehouses (cold chain, particularly for storing mangoes, with a cooling capacity of 80 000 tonnes per year) in KORHOGO |
| 6 | Establishment of an agro-industrial, commercial and logistics platform (PK 108) |
| 7 | Construction of terminals and logistics platforms |
| 8 | Construction of a wholesale market |
| 9 | Construction of a modern market with a modern shopping centre. |
| 10 | Establishment and development of industrial zones in Adiaké and Tiapoum |
| 11 | Construction of themed markets (timber, hardware, mechanics, fisheries products) |
| 12 | Expansion of the industrial activity zone park in KORHOGO |
| No. | SECTORS : SERVICES / EDUCATION |
| 1 | Listening and telephone call centre |
| 2 | Primary and secondary school construction project |
| 3 | Opening of an international high school (French or American) |
| 4 | Construction of a municipal plant nursery in Bouaké |
| 5 | Construction of a cinema and performance venue in Bouaké |
| 6 | Establishment of a sanitation brigade |
| 7 | Rehabilitation of the Bouaké municipal swimming pool |
| 8 | Modernisation of the Waraniéné craft centre |
| 9 | Construction of an agricultural training centre |
| 10 | Construction of a vocational high school in the fields of fishing, mining, construction, solar energy, etc. in the region |
| 11 | Construction and equipping of a girls' school of excellence with a boarding facility |
| 12 | Project to support the creation of income-generating activities (AGR) and micro and small enterprises (MPE) for 500 young people in the Sud-Comoé Region |
| 13 | Construction of phase 1 of the university town in Adiaké |
| 14 | Construction and equipping of the Technical Centre for Applied Arts (CTAA) and support for graduates' access to employment |
| 15 | Construction of a football sports-study centre with three (03) training stadiums and a small stand over 20 hectares |
| 16 | Construction of a sports academy with a hotel and casino at N’Zi river lodge |
| 17 | Construction of technical and vocational high schools : • Construction of 04 introductory art schools (01 in each department of the PORO Region) • Construction of a tourism and hotel-management training centre • Construction of a tourism and hotel-management training centre |
| 18 | Establishment of a general mechanics and metalworking activity zone over 10 hectares (metalwork, automotive, motorcycles, aluminium, glazing and electrical work), including a training garage and a school specialising in solar energy, equipped with modern facilities, in SINEMATIALI |
| 19 | Construction of private universities and higher education institutions |
| 20 | Construction of a fire station in DIKODOUGOU and MBENGUE |
| 21 | Construction of pre-schools and primary schools in every neighbourhood of the municipality of Maféré |
| 22 | Establishment of a municipal library in Maféré |
| No. | SECTORS : CONSTRUCTION / INFRASTRUCTURE |
| 1 | Construction of the main bus station in Bouaké |
| 2 | Construction of an interchange at the prefecture crossroads in Bouaké |
| 3 | Construction of a flyover interchange |
| 4 | Start of implementation of the sustainable urban mobility plan |
| 5 | Construction of an EcoUniversCities city |
| 6 | Construction of eight (08) modern embarkation and disembarkation jetties |
| 7 | Construction of a cross-border bus terminal/parking facility in Noé (including a hotel and catering complex and storage areas) |
| 8 | Paving of the Akressi - Abengourou road sections |
| 9 | Paving of the Eboué-Etueboué-Akounougbé-Eboinda road sections |
| 10 | Construction of a modern airport terminal (ahead of international flights) |
| 11 | Urban redevelopment around the A3 motorway (following issuance of a DUP) |
| 12 | Construction of an intercity and international bus station |
| 13 | Paving of the pavements in the city of Bouaké |
| 14 | Construction of 06 bus stations (03 in KORHOGO and 03 in the other departments) |
| 15 | Construction of a new bus station in Maféré |
| 16 | Street lighting project for the outlying neighbourhoods of the municipality of Maféré |
| 17 | Street paving project in the municipality of Maféré |
| No. | SECTORS : TOURISM / HOUSING |
| 1 | Construction of 5 000 social, mid-range and high-end housing units |
| 2 | Development of a green leisure park over 40 hectares |
| 3 | Construction of the Small-Scale Processing and Crafts Products Exhibition Centre (CEPTA) |
| 4 | Development of Ehotilé Islands National Park for tourism purposes |
| 5 | Construction of a hotel complex in a lush forest covering 10 to 15 hectares, comprising 25 fully self-contained duplex bungalows |
| 6 | Preparation and implementation of the ecotourism development and management plan for the Soumié classified forest |
| 7 | Implementation of the development and management plan and socio-economic development of the Tanoé-Ehi Voluntary Nature Reserve |
| 8 | Creation of tourist routes |
| 9 | Development of tourist areas in Tiapoom, Adiaké, Aboisso and Assinie |
| 10 | Creation of a private rally circuit over an area of 5 hectares |
| 11 | Construction and equipping of a regional museum |
| 12 | Construction of 20 000 affordable, mid-range and high-end housing units |
| 13 | Production and sale of serviced land reserves for housing construction |
| 14 | Development of a 100-bed hotel / apartment facility for patients' companions |
| 15 | Rehabilitation of craft villages in FAKAHA and NIONFOUIN |
| No. | SECTORS : MINING / ENERGY / ENVIRONMENT |
| 1 | Construction of a solar panel and equipment manufacturing plant (CÔTE D’IVOIRE SOLAIRE) with a capacity of 50 MW per year |
| 2 | Establishment of a biofuel and fuel production unit using cashew shells, with a capacity of 13 500 tonnes per year |
| 3 | Construction of a waste recovery and engineered landfill centre and a transfer centre to modernise and manage solid waste jointly across inter-municipal groupings |
| 4 | Construction of a plant processing coconut waste into biochar, with a capacity of 1 440 tonnes per year |
| 5 | Establishment of a charcoal and by-product production plant (using empty palm-kernel bunches and oil-palm trunks) |
| 6 | Establishment of a medical and industrial waste storage and disposal unit with a capacity of 200 tonnes per year |
| 7 | Restoration of mangroves and surrounding vegetation |
| 8 | Construction sand extraction and marketing project |
| 9 | Establishment of a plant processing palm and coconut shells into biomass and by-products |
| 10 | Restoration of ecosystems adjoining the national sections of the Bia-Tanoé rivers over an area of 552 hectares |
| 11 | Development of a phosphate deposit in Aboisso |
| 12 | Additional development of the AFEMA gold mine |
| 13 | Bottling and marketing of mineral spring water in krindjabo |
| 14 | Establishment of biomass power plants in DIKODOUGOU • Development of gasification plants using rice husks |
| 15 | Establishment of a solid-waste treatment and conversion unit producing biomass in Maféré |
| 16 | Construction of a water reservoir in Maféré |
| 17 | Solar tricycle assembly project for passenger transport in Maféré |
| No. | SECTORS : HEALTH / INDUSTRY |
| 1 | Special pharmaceutical zone project |
| 2 | Establishment of an electric motorcycle assembly plant |
| 3 | Construction of an international clinic equipped with state-of-the-art technical facilities |
| 4 | VITIB development project |
| 5 | Construction of the modern N’DOTRE vehicle scrapyard |
| 6 | Drip irrigation pipe manufacturing plant with a capacity of 32 400 000 metres per year |
| 7 | Construction of an integrated knitwear manufacturing plant with a capacity of 20 tonnes per day |
| 8 | Construction of a home-textile manufacturing plant with a capacity of 50 tonnes per day |
| 9 | Greige fabric plant for African printing |
| 10 | Denim fabric plant with a capacity of 19 tonnes per day and a capacity of 8,30 tonnes per day |
| 11 | Ready-to-wear clothing plant with a capacity of 78 000 items per day |
| 12 | Construction of a self-contained knitted-fabric manufacturing plant with a capacity of 12 tonnes per day |
| 13 | Takeover of the Gonfreville textile plant (from spinning to garment making) over 60 Ha |
| 14 | Establishment of a jute production plant (bags for packaging agricultural products) |
Source : CNP-PPP
Investment trends from 2019 to 2023 (in billions of FCFA)
| Categories | 2019 | 2020 | 2021 | 2022 | 2023 |
| Public | 1 734,8 | 1 962,0 | 2 293,2 | 3 140,3 | 3 257,2 |
| Private | 6 111,1 | 5 418,7 | 6 206,9 | 7 886,7 | 8 984,7 |
Source : MEPD/DGE
Investment programming trends from 2024 to 2029 (in billions of FCFA)
2024 | 2025 | 2026 | 2027 | 2028 | 2029 | |
| Public | 3 692,3 | 3 879,1 | 4 395,9 | 4 932,2 | 5 365,1 | 5 852,3 |
| Private | 10 048,7 | 11 406,5 | 12 863,2 | 14 724,5 | 16 617,2 | 18 582,5 |
Source : MEPD/DGE
Volume of approved investments from 2012 to 2023
Source : CEPICI
Breakdown of approved FDI by sector of activity in 2023 (in billions of FCFA)
| Sector of activity | FDI amount | Percentage |
| AGRI-FOOD / AGRO-INDUSTRY | 148 039 039 381 | 29,20 |
| CHEMICAL INDUSTRY (COSMETICS - PHARMACEUTICALS - RUBBER) | 74 541 036 904 | 14,70 |
| CONSTRUCTION INDUSTRY | 71 756 949 510 | 14,15 |
| TRANSPORT / STORAGE (HANDLING) | 67 710 517 031 | 13,35 |
| TELECOMMUNICATIONS | 56 934 683 639 | 11,23 |
| OTHER MANUFACTURING INDUSTRIES | 50 109 237 115 | 9,88 |
| ENERGY (GAS - WATER) | 16 047 696 298 | 3,16 |
| EXTRACTIVE INDUSTRY | 11 446 300 577 | 2,26 |
| OTHER SERVICES | 5 195 164 233 | 1,02 |
| HOTELS (FOOD SERVICE - ACCOMMODATION) | 4 744 631 242 | 0,94 |
| EDUCATION / TRAINING / HEALTH | 925 371 194 | 0,18 |
| FOOD-CROP FARMING, LIVESTOCK | -411 307 602 | -0,08 |
| Grand total | 507 039 319 522 | 100 |
Source: CEPICI
Breakdown of approved FDI by sector of activity in 2023

Source : CEPICI
Ten (10) main foreign investor countries in 2023

Source CEPICI
Main foreign investors in 2023
RANK | ORIGIN | AMOUNT INVESTMENTS |
1 | Burkina Faso | 112 926 127 808 |
2 | Turkey | 66 175 424 172 |
3 | China | 49 976 666 144 |
4 | France | 49 206 480 601 |
5 | Togo | 48 296 684 599 |
6 | Mauritius | 29 861 709 612 |
7 | Morocco | 18 337 971 107 |
8 | British Virgin Islands | 15 600 000 000 |
9 | Senegal | 14 029 748 730 |
10 | Lebanon | 12 383 317 016 |
11 | Hong Kong | 11 906 717 205 |
12 | Mali | 11 111 222 510 |
13 | United Arab Emirates | 10 724 284 839 |
14 | Cyprus | 9 214 430 975 |
15 | England | 7 289 075 166 |
16 | Switzerland | 4 590 600 513 |
17 | Panama | 4 394 853 076 |
18 | Netherlands | 4 144 919 105 |
19 | Singapore | 3 307 735 958 |
20 | Tunisia | 3 034 566 643 |
21 | Cameroon | 2 877 534 007 |
22 | Belgium | 2 374 459 910 |
23 | Niger | 2 324 232 187 |
24 | Luxembourg | 2 302 451 511 |
25 | Cayman Islands | 2 022 000 709 |
26 | India | 1 878 125 609 |
27 | Spain | 1 578 540 185 |
28 | Ghana | 1 283 860 730 |
29 | Malaysia | 806 066 162 |
30 | Italy | 595 848 649 |
31 | Benin | 518 836 743 |
32 | USA | 498 278 438 |
33 | Portugal | 497 327 549 |
34 | Germany | 292 914 315 |
35 | Canada | 272 057 568 |
36 | Nigeria | 168 009 074 |
37 | Monaco | 143 985 835 |
38 | Ukraine | 51 270 000 |
39 | Sudan | 40 984 566 |
| Grand total | 507 039 319 522 | |
Source : CEPICI
One-Stop Shop for Business Formalities (GUFE)
| Item | 2022 | 2023 | Change |
| Number of applications submitted | 23 229 | 25 422 | 9,4% |
| Number of companies created | 23 940 | 26 117 | 9% |
| Projected number of jobs | 6 273 | 5 207 | -17% |
| Average number of companies created per day | 95 | 101 | 6% |
| Average time to set up a company, in days | 3,4 days | 5,2 days | - |
Source : CEPICI
Project catalogue
No. | SECTOR : AGRO-INDUSTRY |
1 | Industrial irrigated maize plantation covering 600 Ha |
2 | Industrial chilli pepper plantation covering 50 Ha |
3 | Industrial plantain plantation covering 100 Ha |
4 | Industrial pineapple production over 2000 Ha |
5 | Construction of a cashew nut processing plant with a capacity of 15 000 tonnes per year |
6 | Natural rubber plant processing latex with a capacity of 70 000 tonnes per year |
7 | Shea nut processing plant with a capacity of 1000 tonnes per year |
8 | Construction of a mango and vegetable drying plant (4 000 tonnes of vegetables and 3 000 tonnes of dried mangoes per year) – 2PAI-NORD (CI) |
9 | Construction of a peanut oil and paste plant producing 5 800 tonnes of products per year (1 500 tonnes of oil and 4 300 tonnes of peanut paste per year) – 2PAI-NORD (CI) |
10 | Construction of a plant producing cottonseed oil and animal feed (3 800 tonnes of oil and 10 700 tonnes of animal feed per year) – 2PAI-NORD (CI) |
11 | Construction of a meat production plant with a capacity of 13 300 tonnes per year – 2PAI-NORD (CI) |
12 | Construction of a mango and cashew apple juice plant (90 000 tonnes of fresh mangoes and 800 000 tonnes of cashew apples processed per year) - 2PAI-NORD (CI) |
13 | Construction of a plant producing oil from shea butter (1 000 tonnes per year) – 2PAI-NORD (CI) |
14 | Construction of a maize flour plant with a capacity of 90 000 tonnes per year – 2PAI-NORD (CI) |
15 | Construction of a packaging plant for fresh market-garden produce (54 000 tonnes of fresh vegetables per year) – 2PAI-NORD (CI) |
16 | Frozen plantain and yam chips production unit with a capacity of 10 000 tonnes per year |
17 | Fruit and vegetable processing unit producing jam, cosmetic products and spices, with a capacity of 18 000 tonnes per year |
18 | Construction of 15 independent cassava processing units, each with a capacity of 25 tonnes per day |
19 | Cassava processing unit with a capacity of 1,5 tonne per day |
20 | Cassava plantation combined with a cassava-to-starch processing plant with a capacity of 12 tonnes per hour |
21 | Okra processing unit with a capacity of 1 tonne per day |
22 | Value addition to products in the cocoa value chain by « Maison Mandjou ». |
23 | Establishment of a 6000 Ha rice-growing complex in central Côte d’Ivoire |
24 | Development of rice-growing complexes in the Agneby-Tiassa Region |
25 | Establishment of a unit to process raw cocoa beans into finished and semi-finished products (cocoa liquor, cocoa powder, cake and cocoa butter), with a capacity of 30 000 tonnes per year |
26 | Industrial maize plantation covering 100 Ha |
27 | Establishment of an integrated agro-industrial pineapple production and processing unit over 250 hectares |
28 | Establishment of an integrated agro-industrial rice production and processing unit |
29 | Establishment of a unit producing refined oil (olein), stearin and fatty acids (olein/cooking oil: 80 000 t / year, fatty acids: 5 000 t / year; stearin: 20 000 t / year) |
30 | Establishment of a unit producing oil, meal and shells from palm kernels (palm kernel oil / year: 4 000 t / year; meal: 5 000 t / year; palm kernel shells: 12 000 t / year) |
31 | Establishment of a cocoa bean processing unit producing cocoa mass, with a capacity of 3 000 tonnes per year (for cooperatives) |
32 | Establishment of a palm fruit processing unit producing red palm oil, with a capacity of 32 400 tonnes per year |
33 | Establishment of a TSR10-type rubber production plant with a capacity of 12 500 tonnes per year |
34 | Establishment of a natural rubber plant processing latex with a capacity of 33 000 tonnes per year |
35 | Establishment of modern food-crop storage and drying units |
36 | Establishment of three (03) cassava-to-starch flour processing units for the agri-food industry, each with a capacity of 3 000 tonnes per year |
37 | Establishment of a palm oil production unit with a capacity of 6 000 tonnes per year |
38 | Establishment of a modern agro-industrial processing unit for cereals, food crops, tubers and oilseeds, with a capacity of 10 000 tonnes per year |
39 | Project to take over a semi-industrial unit producing and marketing attiéké and by-products (4,5 tonnes of attiéké /month, 1 tonne of starch, 1 tonne of cassava peel for livestock feed) |
40 | Establishment of a small-scale organic fertiliser plant using cocoa residues, with a capacity of 1 500 tonnes per year |
41 | Establishment of an industrial coconut plantation and processing into by-products |
42 | Establishment of a local coffee processing unit (to be certified) |
43 | Establishment of an industrial plantation of premium local pepper (to be certified) |
44 | Establishment of an industrial food-crop and fruit plantation (papaya, passion fruit, mangosteen, etc.) |
45 | Project to take over the industrial dessert banana plantation (former CANAVESE) in Akressi |
46 | Establishment of a maize and cassava processing unit in Aboisso |
47 | Establishment of small-scale cashew processing units |
48 | Development and rehabilitation of irrigated food-crop areas in NAFOUN and DIKODOUGOU |
49 | Establishment of a two-hectare greenhouse market-gardening plantation in Maféré |
50 | Establishment of a four-hectare irrigated plantain plantation in Maféré |
51 | Industrial production of Maféré Bread |
No. | SECTOR : LIVESTOCK |
1 | Establishment of a poultry farm with 1,2 million birds |
2 | Construction of a modern poultry slaughterhouse with a capacity of 50 000 birds per day |
3 | Development of an integrated cattle ranching project, including a vocational training centre and a fodder production unit (three ranches to fatten 3 000 animals over 1 500 ha) |
4 | Construction of a livestock feed plant using rice bran, mango peel and cashew apple peel (340 000 tonnes of livestock feed per year) – 2PAI-NORD (CI) |
5 | TAABO fisheries park covering 76 Ha |
6 | Fish farming in floating cages with a capacity of 20 000 m3 |
7 | Fish feed production plant with a capacity of 2000 tonnes per year |
8 | 10 modern fish-drying ovens with a capacity of 100 tonnes per day |
9 | Integrated poultry hub covering 16 Ha |
10 | Hatcheries for day-old chicks, with a capacity of 2 300 000 day-old chicks per year |
11 | Pig farm with a capacity of 236 000 Kg per year |
12 | Integrated pig production project |
13 | Organic pig feed production plant with a capacity of 800 tonnes per year |
14 | Construction of a poultry complex to produce poultry and by-products (protein meal) |
15 | Construction of a fisheries production and processing complex in Grand Bassam |
16 | Establishment of a poultry feed production unit with a capacity of 5 000 tonnes per year |
17 | Establishment and operation of a fish farm covering 25 hectares |
18 | Establishment and operation of a marine fishing unit producing 720 tonnes of fish per year |
19 | Establishment of a day-old chick production unit with a capacity of 12 000 000 chicks per year |
20 | Shrimp farming project with annual production of 1200 T |
21 | Aquaculture industry modernisation project on Lake Ayamé |
22 | Fish farming development project (Emeraude Pisciculture Sud Comoé farm): production of 10 tonnes of fresh tilapia per year |
23 | Installation of livestock feed (fodder) production units: 5 000 tonnes per year |
24 | Establishment of a fish farm in LOKOLI |
25 | Support for young people to take up beekeeping and honey production for export in the LOKOLI area |
26 | Construction of a modern abattoir in Maféré |
No. | SECTORS : LOGISTICS / TRADE |
1 | Development of a logistics platform in the 1000-hectare industrial zone in Bouaké |
2 | Installation of a cold chain with a containerised central refrigeration system |
3 | Construction of the Bouaké wholesale market over 12,4 Ha |
4 | Construction of a space for 200 restaurants / refreshment stands |
5 | Establishment of cold-storage and ripening warehouses (cold chain, particularly for storing mangoes, with a cooling capacity of 80 000 tonnes per year) in KORHOGO |
6 | Establishment of an agro-industrial, commercial and logistics platform (PK 108) |
7 | Construction of terminals and logistics platforms |
8 | Construction of a wholesale market |
9 | Construction of a modern market with a modern shopping centre. |
10 | Establishment and development of industrial zones in Adiaké and Tiapoum |
11 | Construction of themed markets (timber, hardware, mechanics, fisheries products) |
12 | Expansion of the industrial activity zone park in KORHOGO |
No. | SECTORS : SERVICES / EDUCATION |
1 | Listening and telephone call centre |
2 | Primary and secondary school construction project |
3 | Opening of an international high school (French or American) |
4 | Construction of a municipal plant nursery in Bouaké |
5 | Construction of a cinema and performance venue in Bouaké |
6 | Establishment of a sanitation brigade |
7 | Rehabilitation of the Bouaké municipal swimming pool |
8 | Modernisation of the Waraniéné craft centre |
9 | Construction of an agricultural training centre |
10 | Construction of a vocational high school in the fields of fishing, mining, construction, solar energy, etc. in the region |
11 | Construction and equipping of a girls' school of excellence with a boarding facility |
12 | Project to support the creation of income-generating activities (AGR) and micro and small enterprises (MPE) for 500 young people in the Sud-Comoé Region |
13 | Construction of phase 1 of the university town in Adiaké |
14 | Construction and equipping of the Technical Centre for Applied Arts (CTAA) and support for graduates' access to employment |
15 | Construction of a football sports-study centre with three (03) training stadiums and a small stand over 20 hectares |
16 | Construction of a sports academy with a hotel and casino at N’Zi river lodge |
17 | Construction of technical and vocational high schools : • Construction of 04 introductory art schools (01 in each department of the PORO Region) • Construction of a tourism and hotel-management training centre • Construction of a tourism and hotel-management training centre |
18 | Establishment of a general mechanics and metalworking activity zone over 10 hectares (metalwork, automotive, motorcycles, aluminium, glazing and electrical work), including a training garage and a school specialising in solar energy, equipped with modern facilities, in SINEMATIALI |
19 | Construction of private universities and higher education institutions |
20 | Construction of a fire station in DIKODOUGOU and MBENGUE |
21 | Construction of pre-schools and primary schools in every neighbourhood of the municipality of Maféré |
22 | Establishment of a municipal library in Maféré |
No. | SECTORS : CONSTRUCTION / INFRASTRUCTURE |
1 | Construction of the main bus station in Bouaké |
2 | Construction of an interchange at the prefecture crossroads in Bouaké |
3 | Construction of a flyover interchange |
4 | Start of implementation of the sustainable urban mobility plan |
5 | Construction of an EcoUniversCities city |
6 | Construction of eight (08) modern embarkation and disembarkation jetties |
7 | Construction of a cross-border bus terminal/parking facility in Noé (including a hotel and catering complex and storage areas) |
8 | Paving of the Akressi - Abengourou road sections |
9 | Paving of the Eboué-Etueboué-Akounougbé-Eboinda road sections |
10 | Construction of a modern airport terminal (ahead of international flights) |
11 | Urban redevelopment around the A3 motorway (following issuance of a DUP) |
12 | Construction of an intercity and international bus station |
13 | Paving of the pavements in the city of Bouaké |
14 | Construction of 06 bus stations (03 in KORHOGO and 03 in the other departments) |
15 | Construction of a new bus station in Maféré |
16 | Street lighting project for the outlying neighbourhoods of the municipality of Maféré |
17 | Street paving project in the municipality of Maféré |
No. | SECTORS : TOURISM / HOUSING |
1 | Construction of 5 000 social, mid-range and high-end housing units |
2 | Development of a green leisure park over 40 hectares |
3 | Construction of the Small-Scale Processing and Crafts Products Exhibition Centre (CEPTA) |
4 | Development of Ehotilé Islands National Park for tourism purposes |
5 | Construction of a hotel complex in a lush forest covering 10 to 15 hectares, comprising 25 fully self-contained duplex bungalows |
6 | Preparation and implementation of the ecotourism development and management plan for the Soumié classified forest |
7 | Implementation of the development and management plan and socio-economic development of the Tanoé-Ehi Voluntary Nature Reserve |
8 | Creation of tourist routes |
9 | Development of tourist areas in Tiapoom, Adiaké, Aboisso and Assinie |
10 | Creation of a private rally circuit over an area of 5 hectares |
11 | Construction and equipping of a regional museum |
12 | Construction of 20 000 affordable, mid-range and high-end housing units |
13 | Production and sale of serviced land reserves for housing construction |
14 | Development of a 100-bed hotel / apartment facility for patients' companions |
15 | Rehabilitation of craft villages in FAKAHA and NIONFOUIN |
No. | SECTORS : MINING / ENERGY / ENVIRONMENT |
1 | Construction of a solar panel and equipment manufacturing plant (CÔTE D’IVOIRE SOLAIRE) with a capacity of 50 MW per year |
2 | Establishment of a biofuel and fuel production unit using cashew shells, with a capacity of 13 500 tonnes per year |
3 | Construction of a waste recovery and engineered landfill centre and a transfer centre to modernise and manage solid waste jointly across inter-municipal groupings |
4 | Construction of a plant processing coconut waste into biochar, with a capacity of 1 440 tonnes per year |
5 | Establishment of a charcoal and by-product production plant (using empty palm-kernel bunches and oil-palm trunks) |
6 | Establishment of a medical and industrial waste storage and disposal unit with a capacity of 200 tonnes per year |
7 | Restoration of mangroves and surrounding vegetation |
8 | Construction sand extraction and marketing project |
9 | Establishment of a plant processing palm and coconut shells into biomass and by-products |
10 | Restoration of ecosystems adjoining the national sections of the Bia-Tanoé rivers over an area of 552 hectares |
11 | Development of a phosphate deposit in Aboisso |
12 | Additional development of the AFEMA gold mine |
13 | Bottling and marketing of mineral spring water in krindjabo |
14 | Establishment of biomass power plants in DIKODOUGOU • Development of gasification plants using rice husks |
15 | Establishment of a solid-waste treatment and conversion unit producing biomass in Maféré |
16 | Construction of a water reservoir in Maféré |
17 | Solar tricycle assembly project for passenger transport in Maféré |
No. | SECTORS : HEALTH / INDUSTRY |
1 | Special pharmaceutical zone project |
2 | Establishment of an electric motorcycle assembly plant |
3 | Construction of an international clinic equipped with state-of-the-art technical facilities |
4 | VITIB development project |
5 | Construction of the modern N’DOTRE vehicle scrapyard |
6 | Drip irrigation pipe manufacturing plant with a capacity of 32 400 000 metres per year |
7 | Construction of an integrated knitwear manufacturing plant with a capacity of 20 tonnes per day |
8 | Construction of a home-textile manufacturing plant with a capacity of 50 tonnes per day |
9 | Greige fabric plant for African printing |
10 | Denim fabric plant with a capacity of 19 tonnes per day and a capacity of 8,30 tonnes per day |
11 | Ready-to-wear clothing plant with a capacity of 78 000 items per day |
12 | Construction of a self-contained knitted-fabric manufacturing plant with a capacity of 12 tonnes per day |
13 | Takeover of the Gonfreville textile plant (from spinning to garment making) over 60 Ha |
14 | Establishment of a jute production plant (bags for packaging agricultural products) |
Source : CNP-PPP