Petroleum and Natural Gas
PETROLEUM AND NATURAL GAS
Côte d’Ivoire intends to position itself as the main sub-regional oil hub. At the end of 2024, the Ivorian sedimentary basin comprised fifty (50) blocks, of which twenty-two (22) in exploration, six (06) in production and twenty-two (22) open.
As part of the development of the sector, several reforms have been carried out, notably the revision of the petroleum code through Ordinance No. 2012-369 of 18 April 2012 amending Law No. 96-669 of 29 August 1996. This code, which provides for greater flexibility, is an effective tool for attracting more investment into the sector.
The main crude oil and natural gas blocks in production in Côte d’Ivoire are: CI-11 (Lion and Panthère fields), CI-26 (Espoir field), CI-27 (Foxtrot, Mahi, Marlin and Manta fields), CI-40 (Baobab field) and CI-101 & CI-802 (Baleine field)
Crude oil production
Côte d’Ivoire’s crude oil production in 2024 was 16 154 986 barrels, corresponding to a daily flow of 44 139 barrels. This production is up 50.25% compared with the results obtained in 2023, owing to the start of production at the Baleine field on 27 August 2023 and to the performance of the other fields.
Most of the crude oil production is exported. In 2024, exports accounted for 94.23% of production.
Production in barrels of crude oil from 2015 to 2024
| Block | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 |
| CI-11 | 185 221 | 141 937 | 195 641 | 111 520 | 170 496 | 152 174 | 106 959 | 161 194 | 142 553 | 172 665 |
| CI-26 | 5 148 986 | 4 609 039 | 3 398 882 | 3 107 408 | 2 793 656 | 2 242 385 | 1 613 597 | 1 972 562 | 1 695 988 | 1 627 074 |
| CI-27 | 415 409 | 829 270 | 894 787 | 599 128 | 590 926 | 605 950 | 540 120 | 612 694 | 598 573 | 573 994 |
| CI-40 | 4 985 527 | 9 846 649 | 7 951 194 | 7 966 586 | 9 639 055 | 7 641 883 | 6 512 587 | 6 554 106 | 6 235 621 | 5 684 736 |
CI-101 CI-802 | - | - | - | - | - | - | - | - | 2 079 461 | 8 096 517 |
| TOTAL | 10 735 143 | 15 426 895 | 12 440 504 | 11 784 642 | 13 194 133 | 10 642 392 | 8 773 263 | 9 300 556 | 10 752 196 | 16 154 986 |
| Change (%) | 55,55 | 43,70 | -19,36 | -5,27 | 11,96 | -19,34 | -17,56 | 6,01 | 15,61 | 50,25 |
Source : Ministry of Mines, Petroleum and Energy, DGH Yearbook
- Natural gas production
Natural gas production in 2024 was 91 198 002 MMBTU, an average of 249 857.5 MMBTU per day. It shows a decline of 2.65% over one year, explained by the drop in gas demand from the electricity sector (mainly due to the unavailability of the Azito IV power plant).
However, average annual growth of 1.66% in natural gas production should be noted over the period 2015-2024.
The electricity sector is the main outlet for natural gas, with annual consumption in 2024 of 83 441 702 MMBTU, corresponding to 91.50% of the total quantity of natural gas sold.
Natural gas production by block from 2015 to 2024
| Blocks | Fields | Production (million MMBTU) | |||||||||
| 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | ||
| CI-11 | Lion and Panthère | 5,48 | 3,92 | 7,58 | 3,82 | 5,73 | 6,7 | 5,77 | 3,92 | 2,64 | 4,26 |
| CI-26 | Espoir | 15,92 | 15,33 | 11,69 | 13,77 | 11,69 | 9,45 | 6,52 | 7,24 | 5,94 | 5,30 |
| CI-27 | Foxtrot, Mahi, Marlin and Manta | 56,11 | 60,72 | 54,13 | 48,10 | 52,52 | 60,23 | 70,78 | 78,29 | 83,96 | 73,62 |
| CI-40 | Baobab | 1,08 | 4,66 | 2,68 | 3,39 | 3,85 | 0 | 0,74 | 0,86 | 0,70 | 0,50 |
CI-101 CI-802 | Baleine | - | - | - | - | - | - | - | - | 0,435 | 7, 53 |
| Total | 78,60 | 84,63 | 76,09 | 69,09 | 73,79 | 76,37 | 83,814 | 90,320 | 93,685 | 91,20 | |
| Change (%) | 4,37 | 7,68 | -10,10 | -9,19 | 6,80 | 3,49 | 9,75 | 7,76 | 3,7 | -2,65 | |
Source : Ministry of Mines, Petroleum and Energy, DGH Yearbook
- Outlook
The sector’s outlook is driven by phase 3 of the development of the Baleine field, for which preparatory work began in the 1st half of 2025 and start of operations is planned for 2028. This phase should bring production at the Baleine field to about 150 000 barrels/day of crude oil and 170 million cubic feet per day of natural gas from 2029.
In addition, major investments are under way in the various oil fields to increase production and transport capacity:
Intensification of block promotion campaigns and exploration activities to discover new crude oil and natural gas reserves;
The development of the CI-27 field;
The preparation of drilling for phase 4 of the development of the Espoir field in block CI-26;
The 5th phase of the BAOBAB field (CI-40);
The development of the CI-11 field;
The bringing into production of marginal fields in the Ivorian sedimentary basin, notably the development of the fields in blocks CI-525 (Kudu and Eland), CI-523 (Ibex) and CI-103 (Paon).
Thus, under the effect of the development of the various phases of the Baleine field and of investments in the other fields, national crude oil production should grow strongly between 2024 and 2029, rising from 44 139 barrels/day to 194 721 barrels/day, an average annual increase of about 34.6% over the period; natural gas production should grow by about 20.2% a year on average, rising from 232.838 million cubic feet/day in 2024 to 584 million cubic feet/day in 2029, and would thus ensure sufficient natural gas supply to cover domestic needs.
These prospects should be reinforced by the start of development of the CALAO field, discovered in March 2024 and currently being appraised.