Rail transport
Côte d’Ivoire has a 1 260 km railway line linking it to Burkina Faso, of which 639 km are in national territory and 621 km in Burkina Faso.
The operation of the railway infrastructure has been entrusted to SITARAIL since 1994, which enabled freight traffic to double within 5 years, rising from 504 000 tonnes in 1996 to more than one million tonnes in 2001. Since then, traffic has been below one million tonnes of freight per year. Over the whole of 2024, rail freight traffic stood at 795 286 tonnes, an increase of 7.7%. (This refers to invoiced freight.)
As regards passenger traffic, it recorded a continuous decline over the 2014 – 2019 period, falling from 170 738 to 107 800. This traffic, suspended in 2020 owing to COVID-19 restrictions, has still not resumed.
Trends in rail traffic
| Indicator | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 |
| Total freight carried (in thousand tonnes) | 888,7 | 869,0 | 804,9 | 997,0 | 809,6 | 799,7 | 936,6 | 1 016,2 | 983,2 | 993,6 | 886,8 | 738,3 | 795,3 |
| Number of passengers carried (in thousands) | 272,9 | 292,8 | 170,7 | 168,4 | ND | 139,3 | 124,7 | 107,8 | ND | ND | ND | ND | ND |
Source : Ministry of Transport
a : Including intra-Burkina Faso traffic
The development of rail transport remains limited owing to the inadequacy and obsolescence of the infrastructure and operating equipment.
As part of improving urban mobility, the city of Abidjan will have its first metro line by 2027, 37.5 km long on the north-south axis linking the communes of Port-Bouët and Anyama. The project began in 2021 and the main structures to be built are: 20 stations, 40 platforms, 21 rail/road bridges, 1 viaduct and 40 pedestrian footbridges. The physical completion rate stood at 17.3% at end-2024.
Outlook, the following is planned:
rehabilitation of the Abidjan-Ouagadougou-Kaya (Mali) railway and its extension to Tambao (Burkina Faso);
construction of the Ouangolodougou-Niellé-Sikasso railway, 338 km long, of which 86 km in Côte d’Ivoire, at an estimated cost of 123 billion CFA francs (FCFA);
construction of the Man (Côte d’Ivoire)-Nzérékoré (Guinea Conakry) railway, 181 km long, at an estimated cost of 122 billion francs
CFA, of which 151 km in Côte d’Ivoire, for the marketing of Guinea’s iron ore;
construction of the Abidjan-San Pedro-Tabou railway at a cost of 308 billion FCFA;
construction of the San Pedro-Odienné-Mali border railway at a cost of 872 billion FCFA;
the “RAIL CITY” project to enhance the land assets of the Société Ivoirienne de gestion du Patrimoine Ferroviaire (SIPF) in Plateau, with an investment of approximately 300 billion CFA francs;
construction of the Abidjan-Yamoussoukro-Bouaké-Ferkessedougou high-speed train (TGV) line, 640 km long, at an estimated cost of 1 000 billion FCFA.
NB : Ouangolodougou and Niellé are Ivorian towns, whereas Sikasso is a Malian town.