Gold production
Mining production in Côte d’Ivoire is dominated by gold. The national gold potential is estimated at 600 tonnes, located in the north, centre, west and south-east of the country. In total, thirteen (13) gold mines were in operation in 2024: Ity, Bonikro, Tongon, Hiré, Agbaou, Sissingué, Fimbiasso Yaouré, Daapleu, Floleu, Séguéla, Daloa-Zoukougbeu and Lafigué, compared with four (04) gold mines in 2015.
Production grew steadily from 2015 to 2024, rising from 23.54 tonnes to 59.124 tonnes, an increase of 151.2%. The continued upward trend in gold production is mainly due to the combined effects of firm gold prices, the increase in gold output as several gold mines came on stream, and the strengthening of control measures for mining operations. Production is mainly exported in raw form.
Key indicators of the gold sector
| Indicators | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 |
| Gold production (tonnes) | 23,54 | 25,05 | 25,395 | 24,488 | 32,478 | 38,523 | 41,857 | 48,317 | 51,314 | 59,124 |
| Gold production (billions of CFA francs (FCFA)) | 476,507 | 516,079 | 492,390 | 452,236 | 622,771 | 809,306 | 955,362 | 1174,960 | 1596,621 | n/a |
| Gold exports (tonnes) | 22,08 | 23,4 | 25,1 | 24,1 | 32,23 | 38,67 | 43,76 | 47,608 | 50,30 | 57,265 |
| Gold exports (billions of FCFA) | 446,953 | 482,086 | 489,931 | 444,110 | 631,277 | 842,193 | 949,650 | 1190,841 | 1427,153 | 1999,015 |
Number of valid industrial mining permits | 8 | 8 | 8 | 8 | 9 | 12 | 14 | 14 | 14 | 19 |
Source : Ministry of Mines, Petroleum and Energy, Directorate General of Mines and Geology (DGMG)
Outlook, on the basis of production achieved and advanced projects, the upward trend in gold extraction should continue. Gold production is thus expected to reach 61 tonnes in 2025, 63 tonnes in 2026 and 65 tonnes in 2027, thanks to the start of production at the Lafigué gold mine (Dabakala) with the Lafigué mining company in 2024 and at the Koné gold project (Kani and Dianra) of the Montage gold Corp group in 2027.
In addition, the discovery of the world-class gold mine at Doropo, announced in 2025 by the Australian mining company Resolute Mining, with reserves estimated at 100 tonnes, strengthens the sector’s outlook.
Furthermore, with a view to promoting local processing, which remains weak, the Government is committed to developing vocational training in this field and to starting construction of the gold refinery by SODEMI, planned for 2025, so that raw products can be processed locally.