The Government aims to make Côte d’Ivoire one of the leading energy markets in sub-Saharan Africa by 2030. To achieve this vision, several sector reforms were carried out over the period 2014-2024, notably the adoption of law no. 2014-132 of 24 March 2014 establishing the Electricity Code, which led to the creation of a new Electricity Sector Regulatory Authority, the ANARE-CI, endowed with legal personality and financial autonomy. 

Under this law, the activities of production, transmission, distribution, import, export and marketing of electrical energy do not constitute a State monopoly, but are public services. 

By contrast, dispatching activities constitute a State monopoly that may be conceded to a single operator. Dispatching is the activity that consists notably in maintaining the balance between supply and demand, and in ensuring control of the voltage profile and of electrical energy flows on the national networks and interconnections. 

Institutional framework of the electricity sector 

Download 

SECTOR STAKEHOLDERS ROLE NATURE OF POSITIONING IN THE VALUE CHAIN 
STATE OF CÔTE D'IVOIRE Develop the national sector development policy Contracting Authority 
CI-ENERGIES Provide project management for the sector’s works State-owned company 
ANARE-CI Regulate the sector State-owned company 
FOXTROT, CNR, PETROCI. Gas suppliers, supply of natural gas to the IPPs Natural gas sale and purchase contract of the “Take-or-pay” type with CI-ENERGIES. 
CIPREL, AZITO, AGGREKO. Independent Power Producer (IPP) Concession agreement of the BOOT type for CIPREL and AZITO, and of the Lease type for AGGREKO. 
CIE Concessionaire of the public service of dispatching, transmission, distribution and marketing of electricity Public service concession agreement signed with the State 
END CONSUMER Electricity consumption Subscription contract with the CIE 

Source : Ministry of Mines, Petroleum and Energy (MMPE) 

The State’s efforts to strengthen the governance framework have led to progress both in the expansion of generation capacity through massive investments and in the financial balance of the sector. 

  • Infrastructure 

In 2024, the generation fleet consists of eight (8) hydroelectric dams (Ayamé 1, Ayamé 2, Kossou, Taabo, Buyo, Fayé, Soubré and Gribo-Popoli), six (06) thermal power plants (Vridi 1, CIPREL, AZITO, AGGREKO, KARPOWER and Atinkou) and one (1) solar power plant in Boundiali.

Electricity generation capacity rose from 1,391 megawatts (MW) in 2011 to 3019 MW in 2024, a growth of 117% over the period, including 991 MW for hydroelectric dams, 1,998 MW for thermal power plants and 30 MW for solar. 

In addition, the strengthening of transmission and distribution infrastructure enabled the sector to have, in 2024, 32,433 km of low-voltage (LV) lines, 34,656 km of medium-voltage (MV) lines and 7,694 km of high-voltage (HV) lines. 

Lengths of lines and cables (in km) from 2015 to 2024 

Years High voltage Medium voltage Low voltage 

2015 

4,733

22,336

19,599

2016 

5,133

23,516

20,746

2017 

5,133

24,026

21,233

2018 

5,454

24,534

21,651

2019 

6,062

25,432

22,523

2020 

7,103

26,163

23,794

2021 

7,475

27,914

24,559

2022 

7,485

30,525

26,675

2023 

7,552

33,270

28,016

2024 

7,694

34,656

32,433

Source: Ministry of Mines, Petroleum and Energy, CI-ENERGIES Yearbook 

  • PERFORMANCE
  • Strengthening electrification 

In terms of access to electricity, the continuation of the National Rural Electrification Programme (PRONER) enabled the electrification of 4,803 rural localities from 2017 to 2024, raising the number of electrified localities from 3,887 in 2017 to 8,690 at the end of 2024. 

In more detail, the number of electrified localities based on the 2014 General Population and Housing Census (RGPH 2014) rose from 3,887 in 2017 to 8,035 in 2024, while among localities outside the RGPH 2014 base, it rose from 0 to 655 localities over the same period. 

Thus, the coverage rate calculated on the basis of the RGPH 2014 rose from 45.63% in 2017 to 94.3% in 2024, with 98.6% of the population having access to electricity. 

Moreover, thanks to the operationalisation of the Electricity for All Programme (PEPT), 2,278,150 connections were made from 2014 to 2024. 

Indicators of access to electricity 

Years Total number of electrified localities (i) Number of non-electrified localities (ii) Coverage rate (%) (iii) Access rate (%) (iv) 

2017 

3,887

4,631

45.63 

79 

2018 

4,091

4,427

48.03 

80 

2019 

5,075

3,524

58.63 

83 

2020 

6,079

2,614

69.31 

88 

2021 

6,854

1,959

77 

92 

2022 

7,427

1,499

82.4 

95 

2023 

8,052

1,010

88.14 

97 

2024 

8,690

372

94.3 

98.6 

Source: Ministry of Mines, Petroleum and Energy, CI-ENERGIES Yearbook 

NB:

(i) Total number of electrified localities (based on the RGPH 2014 + outside the 2014 base) 

(ii) Number of non-electrified localities of the RGPH 2014 base 

(iii) Number of electrified localities of the RGPH 2014 base / 8518 (Number of localities of the RGPH 2014 base) 

(iv) Populations of electrified localities / Total population; Population estimated taking the RGPH 2014 into account 

  • Reduction in average outage time 

With the implementation of the Côte d’Ivoire Electricity Network Development and Rehabilitation Project (PRODERCI), the overall efficiency of the electricity system improved considerably, rising from 78.78% in 2015 to 83.7% in 2024. The investments made it possible to reduce the average electricity outage time, which fell continuously from 44h38 min in 2015 to 17h54 min in 2021. However, the average time rose again to 26h13 min in 2024 owing to disturbances on the electricity network. 

  • Increase in production 

Gross electricity production has been rising continuously since 2018, from 9,990 GWh to 13,919 GWh in 2024. Production is mainly driven by thermal power plants (75.13%) and hydroelectric power plants (24.5%). Solar energy production is almost marginal (0.37%) in 2024. The first solar power plant, with an installed capacity of 30 MW, was commissioned in September 2023. 

Gross production of the interconnected grid (GWh) 

Year Thermal production Hydroelectric production Solar production Total production Hydroelectric share 

2015 

7,255

1,353

-

8,608

15.71 

2016 

8,543

1,529

-

10,072

15.18 

2017 

7,894

2,047

-

9,941

20.59 

2018 

7,028

2,962

-

9,990

29.65 

2019 

7,125

3,480

-

10,605

32.81 

2020 

7,828

3,376

-

11,204

30.13 

2021 

8,793

2,627

-

11,420

23 

2022 

9,281

2,864

-

12,145

23.57 

2023 

10,119

3,200

24

13,343

23.98 

2024 

10,457

3,411

51

13,919

24.5 

Source: Ministry of Mines, Petroleum and Energy, CI-ENERGIES Yearbook 

Côte d’Ivoire is a net exporter of electricity to the countries of the sub-region, mainly Mali, Burkina Faso and Ghana. In 2024, exports accounted for approximately 5.2% of national production. 

Table 1: Trend in electricity exports (in GWh) from 2015 to 2024 

Year Ghana Benin+Togo Burkina Faso Mali Liberia CLSG* Total 

2015 

227 

13 

382 

248 

2 

- 

872 

2016 

575 

222 

571 

281 

7 

- 

1,656 

2017 

242 

73 

583 

340 

9 

- 

1,247 

2018 

141 

- 

561 

444 

10 

- 

1,156 

2019 

127 

- 

506 

609 

13 

- 

1,255 

2020 

58 

- 

489 

768 

18 

- 

1,333 

2021 

43 

- 

412 

411 

21 

1 

888 

2022 

58 

 

281 

497 

26 

134 

996 

2023 

79 

 

297 

265 

28 

383 

1,052 

2024 

57.09 

- 

201.96 

121.14 

36.81 

313 

730 

Source : Ministry of Mines, Petroleum and Energy, CI-ENERGIES Yearbook 

*CLSG Project: Supply of electricity to Liberia, Sierra Leone and Guinea 

  

  • Electricity prices 

In Côte d’Ivoire, electricity prices are regulated and set according to consumer categories (high, medium or low voltage). The average electricity selling price stood at 83 CFA francs (FCFA) per kWh (excluding taxes) in 2024, compared with 71 FCFA per kWh in 2023.

As part of the implementation of structural measures to restore the financial balance of the electricity sector, the Government made two tariff adjustments: (i) a first 10% increase in electricity tariffs for high- and medium-voltage consumers effective 1 July 2023 and (ii) a second 10% increase for all categories from 1 January 2024.

Trend in average electricity selling prices (FCFA/KWH) excluding tax 

Download 

Trend in average electricity selling prices (FCFA/KWH) excluding tax 

Year Low voltage Medium and high voltage General average 

2024 

80.6 

85 

83 

2023 

70.9 

71.2 

71 

2022 

70 

67 

68 

2021 

71 

66 

69 

2020 

71 

66 

69 

2019 

72 

66 

69 

2018 

74 

66 

70 

2017 

73 

65 

69 

2016 

72 

63 

68 

2015 

71 

63 

67 

Source: MMPE, CI-Energies, CI-ENERGIES Yearbook, ANARE-CI Report 2024 

  

  • Outlook 

The development of the sector is backed by an investment plan to 2040 that takes into account the new context of the energy transition and new technologies, and that will make it possible to meet national consumption, whose average annual growth is estimated at 6.5% over the period 2025-2030, as well as export commitments. This plan provides for the construction of various generation, transmission and distribution facilities. 

As regards generation, the sector plans to commission, before 2030: 

  • solar power plants in Boundiali (phase 2), Bondoukou, Ferkessédougou, Katiola, Kong, Tongon, Touba & Laboua, Odienné, Korhogo and Tengrela, thereby increasing installed capacity by +537.5 MWc;

  • the Aboisso biomass power plant (46 MW);

  • the Songon thermal power plant (358 MW) and the steam turbine of the Atinkou thermal power plant (135MW) in Jacqueville;

  • the Singrobo-Ahouaty (44 MW) and Boutoubré (140 MW) hydroelectric plants. 

Financing of generation is provided by the State (hydroelectric dams) and Public-Private Partnerships (thermal and solar power plants). Investments in transmission and distribution are provided by the State. 

The current energy mix is 75.13% thermal and 24.87% renewable, and is expected to be brought to 55% thermal and 45% renewable in 2030. 

The installed capacity of the generation fleet planned for 2030 is 5,128 MW, compared with 3,019 MW in 2024. 

Coverage and access rates will be 100% by 2030 at the latest. 

The quality of the electricity supplied in Côte d’Ivoire will be improved. The Average Outage Time (TMC) planned for 2030 will be less than 15 hours, which will represent an improvement compared with the lowest time of 16h 24 min of outages recorded in 2020. 

The overall efficiency planned for 2030 is 85%, compared with 83.7% in 2024, a gain of 1.3 points corresponding to an increase of 1.6%. 

Gross production of the interconnected electricity grid (GWh) from 2015 to 2024  

Year 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 
Thermal production 7,255.48,543.37,893.67,0287,1257,8288,7939,28110,11910,457
Hydroelectric production 1,352.51,528.62,047.22,9623,4803,3762,6272,8643,2003,411
Solar production  - - - - - - - -2451
Total production 8,607.910,071.99,940.89,99010,60511,20411,42012,14513,34313,919
Hydroelectric share (in %) 15.7115.1820.5929.6532.8130.132323.5723.9824.50

Source: Ministry of Mines, Petroleum and Energy, CI-ENERGIES Yearbook